Customization: | Available |
---|---|
After-sales Service: | Include |
Warranty: | Include |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Casting bridge cranes are the main lifting and transportation equipment in the smelting workshop of steel mills. They are used for the liquid metal transfer, pouring, and hot metal mixing during the smelting process. Below 125t is generally a YZ type double beam structure. Above 125t is generally YZS type four-beam structure. YZS type adopts main and auxiliary double trolleys, four-beam and four-track structures, mainly composed of bridge frame, main trolley, auxiliary trolley, hook beam, crane operation, and electrical parts. The main trolley runs on the main girder track outside the bridge frame, and the auxiliary trolley is on the bridge frame. The inner side auxiliary beam runs on the track, and the main trolley pick-up device is a hook beam with fixed spacing.
The crane can work under the harsh environment such as -25ºC~+60ºC, indoor hot laying and dust. Suitable for steel smelting workshop use.
YZS type adopts main and auxiliary double trolleys, four-beam and four-track structures, mainly composed of bridge frame, main trolley, auxiliary trolley, hook beam, crane operation and electrical parts. The main trolley runs on the main beam track outside the bridge frame, and the auxiliary trolley is on the bridge frame. The inner side auxiliary beam runs on the track. The main trolley pick-up device is a hook beam with a fixed spacing for lifting and transporting ladle. The sub-trolley runs under the main trolley, and the pick-up device is a hook to cooperate with the main hook. To dump molten steel, steel slag, and other auxiliary lifting operations.
Lifting Capacity
|
125/32
|
140/32
|
160/32
|
180/50
|
200/50
|
225/65
|
240/80
|
280/80
|
320/80
|
Working Class
|
A7
|
||||||||
Span
|
19
|
19
|
27
|
28.5
|
28
|
27
|
22
|
22
|
24.5
|
Lifting Height
(Main Hook)
|
24
|
22
|
25
|
27
|
26
|
32
|
25
|
29
|
28
|
Lifting Height
(Auxiliary Hook)
|
26
|
24
|
26
|
29
|
26
|
34
|
27
|
29
|
33
|
Speed
(Main Hook)
|
7.6
|
7.8
|
9.8
|
7.5
|
6
|
11
|
7
|
12
|
7.5
|
Speed
(Auxiliary Hook)
|
9.7
|
9.7
|
12
|
10
|
10
|
11
|
9.6
|
10
|
10
|
Speed
(Main Trolley)
|
38
|
36
|
43.5
|
40
|
41
|
41
|
35
|
40
|
29
|
Speed
(Auxiliary Trolley)
|
39
|
37.5
|
43.5
|
38
|
38
|
39.5
|
38
|
40
|
39
|
Speed
(crane
|
76
|
73
|
84
|
80
|
78
|
84
|
80
|
80
|
58
|