Electric Hoist Lifting Equipment Double Girder Overhead Crane

Product Details
Customization: Available
After-sales Service: Provide
Warranty: 3 Year
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2024

Suppliers with verified business licenses

Audited Supplier Audited Supplier

Audited by an independent third-party inspection agency

Importers and Exporters
The supplier has import and export rights
Self-branded
The supplier has 7 Self-brands, check the Audit Report for more information
Experienced Team
The supplier has 50 foreign trading staff(s) and 25 staff(s) with over 6 years of overseas trading experience
Years of Export Experience
The export experience of the supplier is more than 10 years
to see all verified strength labels (21)
  • Electric Hoist Lifting Equipment Double Girder Overhead Crane
  • Electric Hoist Lifting Equipment Double Girder Overhead Crane
  • Electric Hoist Lifting Equipment Double Girder Overhead Crane
  • Electric Hoist Lifting Equipment Double Girder Overhead Crane
  • Electric Hoist Lifting Equipment Double Girder Overhead Crane
  • Electric Hoist Lifting Equipment Double Girder Overhead Crane
Find Similar Products

Basic Info.

Model NO.
HC Type Electric Hoist
Certification
GS, RoHS, CE
Condition
New
Operation Form
Cabin
Maximum Lifting Height
25-30m
Maximum Lifting Weight
50-100t
Type
Shipbuilding
Transport Package
Bulk
Specification
Wire Rope Electric Hoist
Trademark
KUANGYUAN
Origin
China
HS Code
8426112000
Production Capacity
100

Product Description

Electric Hoist Lifting Equipment Double Girder Overhead CraneElectric Hoist Lifting Equipment Double Girder Overhead CraneElectric Hoist Lifting Equipment Double Girder Overhead CraneElectric Hoist Lifting Equipment Double Girder Overhead CraneElectric Hoist Lifting Equipment Double Girder Overhead CraneWe are one of the largest and most professional crane manufacturers in China, with total sales of more than 1.6 billion US dollars last year, including sales of 11,000 sets of double-beam and gantry cranes, more than 73,000 sets of single-beam cranes, and more than 100,000 sets of electric hoist and accessories.

We have an advanced, green, whole-industry chain, intelligent manufacturing industrial park, with an investment of 370 million US dollars and more than 4,700 employees, which has been established for more than 20 years.
I really hope to have the opportunity to cooperate with you.
We welcome you to visit our company.

Electric Hoist Lifting Equipment Double Girder Overhead CraneElectric Hoist Lifting Equipment Double Girder Overhead CraneElectric Hoist Lifting Equipment Double Girder Overhead Crane
The process of the rubber-tired gantry crane loading and unloading technology mainly includes the following steps:

Preparatory work: Before starting the operation, it is necessary to check the condition of the equipment to ensure that the tire pressure is normal, the steel wire rope is undamaged, etc. 
.
To start the device: Press the power button and turn the engine key to let the device enter the preheating state. 
.
Adjust position: Ensure the device is in the optimal working condition. 
.
Hook up: Securely attach the load to the hook. 
.
Operating equipment: Start the hoisting mechanism to lower the load, raise the empty hook to a certain height, and then move the crane back to its original position through the trolley and bridge traveling mechanisms, preparing for the next lift. 

.
Mobile equipment: After completing the hoisting task, remove the equipment and ensure it is kept away from the work area. Also, pay attention to the operating condition of the equipment. 

Shut down and power off: After the task is completed, turn off the engine, switch off the power supply, and ensure that the equipment is in a safe state. 

The characteristics of the tire-mounted gantry crane loading and unloading process include: 
Insufficient flexibility: Due to the large span and high stacking levels of gantry cranes, it is difficult to extract containers, resulting in a high rate of container re-stacking, which increases the number of operation steps and time consumption. 
.
Applicable scenarios: It is suitable for water-land intermodal ports with limited site area and large container throughput. 
.
Advantages and disadvantages of the rubber-tired gantry crane loading and unloading process: 
Advantages: It is suitable for environments with limited space and can efficiently handle a large number of containers. 
.
Disadvantages: Insufficient flexibility, difficulty in extracting containers, high rate of container reshuffling, and increased operation steps and time consumption. 


 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier